//Products

Small-Scale Power Plants. Major Requirements. Compact Solutions.

Small-scale power plants and combined heat and power (CHP) units are often located in close proximity to residential areas or other noise-sensitive sites. Compliance with statutory noise emission limits is therefore not optional, but a fundamental requirement for reliable and legally compliant operation.

FAIST supplies pre-assembled compact packages that can be fully operational within three working days, minimizing downtime and eliminating complex on-site installation.

// Compact-Packages

Leistung & Ausstattung

  • Complete pre-assembly at FAIST, including mechanical acceptance of the acoustic enclosure and filter house prior to delivery
  • On-site installation completed within three working days
  • Preconfigured connections for gas and fresh-air supply, enabling fast and straightforward commissioning
  • Individually engineered ventilation system, optimized for effective noise control and minimal pressure loss
  • Exclusive use of explosion-protected components
  • Controlled clean-air conditions in the area between the filter house and acoustic enclosure, ensuring a defined minimum level of contamination protection
// Compact-Packages

Sound Insulation for Combined Heat and Power (CHP) Plants

Acoustic Enclosure and Thermal Insulation Hood in One

During the engineering design process, the frequency spectra of the individual components and the prevailing ambient conditions are analyzed. Based on these findings, our engineers specify the required acoustic components to create an environmentally responsible and cost-efficient solution.

  • Accessibility
  • Ease of disassembly
  • Adequate ventilation
  • Vibration isolation
  • Acoustic optimization

// Integrated Project Concept

FAIST delivers integrated noise control solutions for small-scale power plants and combined heat and power (CHP) units across every phase of the project. As your single point of contact, we manage the entire process—from customized engineering, manufacturing and pre-assembly through to turnkey installation and commissioning on site.

// Contact

Free, no-obligation initial consultation – including a preliminary assessment within 48 hours.

Harald Müller

Consulting | Project Planning | Sales
+49 8282 8880-167
harald.mueller@faist.de

// FAIST Worldwide

A commitment to lasting quality and reliability

Turnover 2025

140 M

Locations

6

Industries

36

Employees

220

Turnover 2025

140 M

Locations

6

Industries

36

Employees

220

Turnover 2025

140 M

Locations

6

Industries

36

Employees

220