Intelligently enhancing efficiency.

Upgrades & Retrofits for
Gas Turbine Power Plants

FAIST retrofit and upgrade solutions for gas turbine power plants. Existing gas turbine power plants are required to operate with increasing flexibility, reliability and cost efficiency. This is exactly where FAIST comes in: with targeted retrofit and upgrade solutions for air intake systems that sustainably improve performance, operational reliability and overall efficiency.

FAIST stands for technical expertise, many years of experience and tailor-made solutions for demanding industrial and power plant applications.

// Retrofit & Upgrades

Existing systems.
New potential.

An air intake system has a direct impact on the performance of a gas turbine. By using modern components, optimized filtration and reduced pressure losses, existing systems can be systematically upgraded without the need for a completely new installation.

Key benefits:

  • increased operational reliability
  • optimized intake air quality
  • reduced pressure losses
  • longer component service life
  • potential performance increase
  • individual adaptation to site and plant requirements
// Retrofit & Upgrades

Solutions tailored to the plant.

FAIST retrofit solutions improve intake air quality, protect the turbine and extend the service life of relevant components. Modern filtration systems reduce pressure losses and enhance overall plant performance, while heat exchangers and evaporative coolers condition the intake air in a targeted manner and can increase operational efficiency.

In many cases, the greatest impact is achieved through the right combination of several components. FAIST evaluates which solution is technically sound and economically viable.

// Project inquiry

Get more out of your air intake system. Whether filtration, pressure loss, intake air cooling or a combination of several measures: FAIST develops retrofit and upgrade solutions tailored to your plant.

// Start inquiry

Free initial consultation with no obligation – feedback with an initial assessment within 48 hours.

Matthias Schultalbers

Leiter Business Unit Air Intake
+49 8282 8880-0
matthias.schultalbers@faist.de

// FAIST Worldwide

A commitment to lasting quality and reliability

Turnover 2025

140 M

Locations

6

Industries

36

Employees

220

Turnover 2025

140 M

Locations

6

Industries

36

Employees

220

Turnover 2025

140 M

Locations

6

Industries

36

Employees

220